News

EXP. ICA028/22/000007 BIOMASS BURNER 12MW

Installation of a 12 MWt biomass combustion chamber to generate the hot air required in the existing drying trommel that used natural gas as fuel and where the fruit pulp is dehydrated, thereby increasing the energy efficiency of the facility, reducing the industry’s natural gas consumption, promoting the use of renewable energies and contributing to reducing CO2 emissions and decarbonizing the industry.

Report for installations over 100 kw (PDF)