Heat recovery of compressors and torches
March 18, 2025
No Comments
The project consisted of improving the water pumping and distribution system at the plant by incorporating waste heat recovery from the system with the new
Replacement of the pumping system
March 18, 2025
No Comments
The project involved the replacement of the initial pumping, filtration and water distribution system with another based on a single pump and a ring distribution
EXP. ICA028/22/000007 BIOMASS BURNER 12MW
January 27, 2025
No Comments
Installation of a 12 MWt biomass combustion chamber to generate the hot air required in the existing drying trommel that used natural gas as fuel
EXP. ICA028/22/000008 BIOMASS BOILER 15 MWT.
January 27, 2025
No Comments
Installation of a 15 MWt biomass boiler to generate steam, and use its thermal energy to satisfy part of the steam demand of the industry’s